Scroll down to learn more about this project

Laboratories

CBRN Laboratory

Abu Dhabi

Project Name: CBRN Laboratory

STH Design all phases of the project with all significant milestones in the project development process.

 

CBRN Analysis Laboratory consists of Chemical, Biological, Radiological & Nuclear Analysis Laboratories. The Site Concept is designed to fulfill the needs of CBRN Analysis Laboratory & Safety with minimum land allocation and work placement using modern designs and high-quality durable materials that are on the “cutting edge” innovation.

Project Description

The Site Concept is designed to fulfill the needs of CBRN analysis Laboratory & Safety with minimum land allocation and work placement using modern designs and high-quality durable materials that are on the “cutting edge” of innovation.

The chemistry laboratory has been designed according to the standards of chemical safety level 3 (CSL3) with ground and roof floor.

Biological Laboratory has been designed under standards of biological safety level 3 (BSL3) and biological safety level 2 (BSL2) with basement, ground, technical, and roof floor.

Radiological and nuclear lab has been designed for handling high radiation samples of safety level (B) with basement, ground, and roof floor. Basement area consists of loading area, future areas for hot cell and activities, and liquid waste treatment.

Unknown sample building has been designed for segregation of unknown samples (chemical, biology, & radio nuclear) consists of ground floor with BLS-3 lab, changing, rest room and services.

Training Building has been designed for training for chemistry, biology and radioactive lab activities. Ground floor area consists of indoor training area, class room/meeting, chemistry lab, biology lab, RN lab, changing, shower area, and MEP services.

Back to Laboratories Projects